top of page
Search

Railtrack survey drilling

Railtrack have finally finished using their contractor to drill and take samples of the cliff rock. There was concern that the spring in the upper field may be disturbed, but we were assured that the drill bit would go down through a sleeve so that nothing can leak into the hole left.


 
 

Comentarios


COPYRIGHT
Copyright © 2010-2025 eastcliffpark.com.  Protected under all applicable international laws and all rights are reserved. No image, text, or any part thereof may be copied, shared or transmitted to others without permission from the Copyright holders. Information herein may not be posted or made available, in whole or in part, on any website, FTP site, electronic bulletin board, newsgroup, or their equivalent.

bottom of page